The plumber installed the sewer lines for the basement today. The second picture shows a close-up of the sewer ejector.
The crew from Jim Giancola Concrete also started laying the rebar for the structural slab today.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
►
2011
(41)
►
October
(3)
►
September
(5)
►
August
(2)
►
July
(5)
►
June
(5)
►
May
(3)
►
April
(3)
►
March
(7)
►
February
(2)
►
January
(6)
►
2010
(85)
►
December
(3)
►
November
(10)
►
October
(8)
►
September
(11)
►
August
(19)
►
July
(8)
►
June
(5)
►
May
(3)
►
April
(5)
►
March
(4)
►
February
(6)
►
January
(3)
►
2009
(162)
►
December
(13)
►
November
(6)
►
October
(4)
►
September
(4)
►
August
(3)
►
July
(3)
►
June
(7)
►
May
(19)
►
April
(23)
►
March
(35)
►
February
(24)
►
January
(21)
►
2008
(34)
►
December
(10)
►
November
(5)
►
October
(8)
►
July
(1)
►
June
(3)
►
May
(2)
►
April
(5)
►
2007
(137)
►
September
(1)
►
June
(22)
►
May
(23)
►
April
(24)
►
March
(26)
►
February
(20)
►
January
(21)
▼
2006
(112)
►
December
(19)
►
November
(22)
►
October
(20)
►
September
(17)
►
August
(17)
▼
July
(12)
I saw Brad at the job site this afternoon. The c...
I stopped by the job site this morning and took a ...
The crew from Jim Giancola Concrete continued thei...
Dennis and his crew from Jim Giancola Concrete con...
The plumber installed the sewer lines for the base...
These pictures were taken on Monday morning. On F...
The mud slab was poured two days ago and is almost...
Here is a picture of that concrete form that was c...
Here are a series of pictures taken on Friday, Jul...
We met with Gary (our architect from Focal Point D...
Today they started laying a bed of gravel on top o...
Lea & Braze Engineering staked the foundation a co...
►