I talked to the field foreman from Ferma, and he said they will be removing the Baker tank on Friday.
The framing contractors from KC Construction were also there, putting in the joists. You can see all the piles of lumber that had been craned onto the tops of the basement walls yesterday.
I called Brad while I was at the site, and he said the inspector was there this morning. We passed the inspection, so Jim Giancola Concrete can pour the stairs and the planter box in the lower courtyard.