Thursday, October 26, 2006

The carpenters and stackers from KC Construction were busy this morning working on different parts of the house, including the rafters, the small balcony, and the front window box.

Brad was there meeting with Brian, the HVAC contractor. They discussed how and where to locate the return air vent on the first floor, the air and exhast ducts for the furnaces and water heater, and the vent for the dryer.

Later Brad called to let me know that Paul from Adanac Fire Protection had not received our paperwork or deposit yet, but I called Paul and he was able to locate the paperwork. Paul just needs a set of plans now so he can begin his work on the project.

No comments:

Post a Comment