Thursday, October 19, 2006

The first picture was taken this morning at 9:30 AM when I stopped by the job site, and the second picture was taken at 2:00 PM after the framers had left. The second floor was completely framed in less than six hours -- amazing work by Rick, his crew, and the framers from KC Construction!

This morning we received a fax from James Lo (Sunnyvale Lumber) with a front door quote. We need him to fix one thing on the quote and send it to us again. I also received an email from Chris Pieper (Argonaut Window & Door) with a quote.

We met with Brad today and gave him the dimensions for the skylight -- a Velux VSE 606.

I still need to go purchase a few glass blocks for the master bathroom. Home Depot didn't seem to carry them, so I'll check Lowes.

And we still need to give Brad the details for the columns for the front porch and the back patio.

Tomorrow, Waterproofing Associates will start waterproofing the floor of the garage in preparation for pouring the concrete. And on Monday the stackers will start building the roof.

No comments:

Post a Comment