Monday, June 26, 2006

The basement is almost completely excavated now. You can see that we have some minor water to deal with.

The last step for the excavator is to build a ramp so they can move machinery into and out of the pit.

Note the green colored Baker tank, just barely visible on the right edge of the third picture. It holds the water that's been pumped out of the ground and lets the sediment settle, so clean water can be pumped out and into the gutter.

No comments:

Post a Comment