Tuesday, July 11, 2006

Today they started laying a bed of gravel on top of thick plastic. The gravel will serve as the base for the mud slab.

In the third picture you can see the forms for one of the light wells.

In the last picture, you can see we still have de-watering issues where they had to dig trenches for the sewer lines. These trenches are several inches lower so that the sewer lines can slope (1/4" per foot) down to the sewer ejector. The sewer ejector will pump the sewer water out of the basement.