The installers from Adanac Fire Protection have been busy putting in the sprinklers in the first floor.
Also, the frames for our front door and garage side-door were delivered. These are just temporary doors for use during construction. As you can see the front door (lying sideways) has the transom above it.
No comments:
Post a Comment