Friday, December 29, 2006

Yesterday evening we had stopped at the job site to look at the rough plumbing for the tubs and showers. We noticed that the plumber had positioned some of the shower heads incorrectly. The guest bath shower, bath #2 shower, and bath #3 tubs are supposed to have shower heads offset from the center line by about 1' to accomodate a shower hose and shower bar. So this morning when I saw Brad at the job site, I told him about it.

Brad had asked me to stop by the job site again in the evening to make sure the subcontractors had locked the gate. It was locked, but the carpenters had left the light on in the basement.

It looked to me like the stucco contractors have finished wrapping the second floor.