Two subcontractors from European Lathing and Plastering were working at the job site this afternoon putting the finishing touches on the layer of building paper and metal mesh.

Two areas they won't be able to complete until next week are (1) the wall above the window seat (because the sheet metal installer from Bonanza Heating and Air Conditioning has not finished installing the window seat roof yet)

and (2) the space below that same cantilevered window seat because the insulation under the seat has not been applied yet.