Tuesday, March 13, 2007

This morning, we met with Leo from Marblus and went over some more granite details, such as the placement of sinks and the reveal for each of the sinks (positive, negative, flush).

All American Scaffold started dismantling the scaffolding and loading it onto their truck.

Troy was there working on the dining room wainscot.

The painters were working in the basement and painting the shutters.

The tile crews were installing tile on the back patio and starting on the master bathroom shower.

Brad had a contractor attach some metal braces to provide support for the granite overhang on the kitchen island. They're embedded in the plywood

Victor, the plumber, showed up later in the afternoon to install a sump pump for the basement sewer ejector.