This morning we went to Home Depot to place a special order for some more lighting fixtures. Unfortunately the fixtures probably won't arrive until late April.

In the afternoon, we met with Lucia at the job site. She brought with her the last vanity top (for bath #2). Her crew had already installed the vanity tops for bath #1 and bath #3 and the fireplace surround.

Later in the afternoon, they completed bath #2 and the master bath vanity backsplash. Here's a picture of Rudy installing the granite in bath #2.

The painting crew was busy taking out window sashes on the first floor and priming all of them along with the casings and the dining room wainscot.

The dining room pocket doors were installed this morning.

The tile crews were busy working on the courtyard steps, the master bath floor, and the balcony.

Leonard from J B Ornamental Iron installed some more railings around the lower courtyard and anchored them into the column.

Finally, I went back to Home Depot and picked up some ceiling fans for the upstairs bedrooms and surface mounted fluorescent lights for the laundry room, pantry, mudroom, and craftroom closet.