We saw Josh, from SolarCity, at the job site today waiting for the city inspector to show up and complete the final inspection of the solar panels. Brad called us later in the afternoon to say that the installation failed the inspection and that SolarCity will have to make some repairs. This will delay Brad's final building inspection because he needs to have the solar installation signed off first.

Today we started creating our punch list by "blue taping" anything that needs to be touched up or fixed. We started on the second floor with the bedrooms. Mostly we found small spots that need a little paint, but there are also some nicks and dings that need to be repaired. This is going to be a long process because (1) we are very picky and (2) it is a large house! (Brad is probably shaking his head as he's reading this :-)