Friday, June 1, 2007

Liam was back today to finish installing the inverter and AC disconnect switch for the solar panels.

Everything is hooked up now and ready to go. I think they just need an inspection and then we can power it up.

The carpet installers finished up the basement. Here are pictures of the basement playroom and the upstairs hallway.

Dave, one of the electricians from CBE Electric came and finished installing light fixtures. He put in the stairway lights for the lower courtyard, and he installed the front entry light and the three pendant lights above the kitchen island.

Fred and Eddie, from Details, were back to finish installing the kitchen range. There was an issue with the location of the electrical outlet for the range -- it was preventing the range from being pushed all the way back against the wall -- causing there to be a 2" gap behind the range! I told them to work with the electrician and come up with a way to fix the problem. In the end, I think they removed the plug and hard-wired the oven.

They also finished installing the washer and dryer in the laundry room.

In the evening, around 6 PM, I returned to the job site to make sure the house had been secured. Well, it turned out that aside from the front door and garage doors, all the other doors in the house were either open or unlocked! Sheesh!