The crew from Jim Giancola Concrete was on site today building the form for the stairs leading down to the lower courtyard and the form for the planter box in the courtyard.

I noticed that a notch had to be cut into the concrete wall for the side yard door leading out of the garage -- as seen in the second picture (oops).

I need to talk to Brad about the window order before we place it. I think some of the basement walls have been framed differently than expected (2x6 vs. 2x4 construction) so we may need to adjust the order for the jamb extensions.

I don't think Ferma Corporation was on site today. As of late this afternoon, the Baker tank was still there (bummer).