Thursday, September 7, 2006

There was lots of activity at the job site this morning with three groups of sub- contractors working at the same time.

Water- proofing Associates was putting the finishing touches on a layer of Ultraseal.

Jim Giancola Concrete had a worker walking the top of the walls, straightening out all of the hold downs. And there was another worker gettting ready to grind down and smooth out some of the concrete at the base of the walls.

And finally there was another crew (probably the carpenters) snapping chalk lines for the walls.