Monday, September 11, 2006

Ferma Corporation started adding a layer of dirt on top of the concrete backfill. Later they will be installing a perforated PVC pipe over crushed rock to provide drainage and prevent buildup of water pressure.

Large piles of lumber have been lowered into the basement, and the framing contractors have started working on the interior walls.

This last picture was taken from the top of the Baker tank, looking down into the basement.

This afternoon we drove down to Cornelia's again. Michelle gave us pricing information for some of the faucets, toilets, and sinks that we like.