Friday, November 3, 2006

I met with Alex from Sound Perfection at the job site this afternoon and discussed our options for home automation and A/V distribution.

I happened to see Victor, the plumber, there. We talked about the master bathroom jaccuzi tub and the guest bathroom changes. He brought up some concerns about the positioning of a tub and vanity in one of the other bathrooms on the second floor.

I also bumped into Rick. He asked me about details for the built-in cabinets in the 1st floor powder room and the guest bathroom, and about some of the art niches in the plans. We'll have to get the details from Gary.

Later in the afternoon, I called Gary and left a message asking him about some of the issues that came up while I was at the job site.

No comments:

Post a Comment