We met with Ernie, from Tile Plus, at the job site this morning and spent about 1-1/2 hours with him going through each of the rooms that will require tile work. Talking with him was very helpful because he gave us a lot a good tips and ideas.

Ekrem, and another electrician from CB Electric Co, were there adjusting a couple of the can lights in the kitchen because of the new soffit. But before that, they had hooked up the main panel to the temporary power pole, and wired up a few circuits. We now have some working lights and outlets!

The drywall installers were back too. They were fixing some of the cutouts they had missed. Also Brad was unhappy with the quality of their work in the coved ceilings in the bedrooms, so they were redoing them.