Saturday, April 21, 2007

Troy was at the job site today building a cap for the balcony ledge.

He and Rob also started installing the door knobs. Brad called and told us we need to pick up door stops.

The painters were there putting their second and final coat of paint on the first floor.

The landscapers were also there working on the driveway and walkway. We noticed someone had dislodged and damaged one of the outdoor lights in front of the garage. More than likely, it was one of the landscapers while driving one of their machines.

No comments:

Post a Comment