Friday, April 20, 2007

When I arrived at the job site this morning, Sunnyvale Lumber had just delivered the door hardware for all of our interior doors.

At the same time, a truck arrived to dump a load of crushed gravel for the driveway bed.

Phil's painters were busy painting the first floor rooms.

And two tile installers from Tile Plus were finishing up the stairs for the lower courtyard.

No comments:

Post a Comment