Tuesday, April 3, 2007

When we arrived at the job site today Freddie, the foreman from Tile Plus, was installing the front porch tiles (is he qualified to do that?).

Right behind him, a crew from Tile Plus was installing the medallion in the front entry.

Earlier, they had also floated the floor in the mudroom and pantry, in preparation for putting in those tiles.

Phil's painters were still busy preping the second floor for painting. Check out the nifty handles called "Door Deckers" they use for handling and stacking the doors.

Russ was back on the job again, working on the stair ends. He said he should be done with the stair ends and railings by next Thursday at the latest.

No comments:

Post a Comment