Monday, April 16, 2007

We met with Russ at the job site this afternoon to discuss some additional balusters. He needs to install two balusters at each of the landings where the stair rail turns 180 degrees.

A crew of painters was busy spraying the trim on the first floor.

Dana was also there this morning installing drawers.

Here are a bunch of drawers for the kitchen cabinets. He wasn't able to install these yet because the painters were working in the kitchen.

No comments:

Post a Comment