Tuesday, May 8, 2007

CB Showers called early this morning to say they were going to be installing a new glass door today, to replace the chipped one in the guest bath. About an hour later, Brad called to confirm the height for the mirror in bath #2. He'll have CB Showers cut it about 1" below the level of the lamp shades that are above the vanity.

When I arrived at the job site, the landscapers were starting to lay out the pavers for the walkway.

As for the driveway, they stopped just short of the sidewalk, because they're waiting for the concrete to be replaced.

Brad was inside the house taping masking paper to the floor -- like carpet runners -- to protect the newly finished wood.

Dana was down in the basement (where it was much cooler!), installing drawer fronts and cabinet doors. We caught up with him putting the finishing touches on the stack of drawers in the craftroom. That's Brad on the left and Dana on the right.

Brad wanted to go pick up the last toilet and the vanity (both for the powder room) so we used his truck and drove back to our house to get the items. With the help of the landscapers, we unloaded his truck and moved the heavy vanity into the power room.

Earlier, Brad had said Mike Rorie from Floors To Go was scheduled to install the carpets on Thursday. But after Brad finished describing all the things that need to happen before Thursday, he decided to call Mike and reschedule the carpet installation for a later date.

Here are some pictures of Dana's handiwork:

Laundry Room

Craftroom

Understair Cabinet (in the Craftroom)

Mudroom

No comments: