Wednesday, May 23, 2007

Today I finished wiping down all the counter tops in the basement. There was a thick layer of dust covering everything. I also started vacuuming the second floor bathrooms and bedrooms.

I installed another pair of speakers in the master bathroom and a couple more hinge door stops, and I fixed the manual lock for the garage door (the old one was broken off -- it looked like someone had opened the garage door while it was bolted closed).

Dana called and said he could start installing the cabinet hardware -- drawer pulls and cabinet door knobs -- tomorrow morning. It was perfect timing because we received the Alno hardware for the kitchen today (along with the Alno towel bars for the master bathroom). We had already purchased all the other hardware from Lowes.

No comments:

Post a Comment