Thursday, May 17, 2007

Here's a picture of the whirlpool tub in the master bathroom. The plumbers finished installing it yesterday and they filled it with water to check for leaks. Unfortunately, I haven't figured out how to let the water out. They installed the Mountain Plumbing waste overflow kit, but I don't think it's working properly... ?

CB Showers installed the large mirror above the double sink vanity in bath #2 this morning.

German, the painter, started working on the back patio. He masked off the patio ceiling and started painting it white.

The city inspector came out and gave us a green, "everything is okay" tag for the main electrical panel. He said the electrician should have put a round glass or metal cover where the meter is supposed to go (instead of the paper that's on there right now). With the temporary power to the house, there are live 220V wires right behind the paper cover. Brad happened to stop by (he doesn't leave until later this afternoon), and I told him about that so he called the electrician.

This morning, I called Sebastian from SolarCity and told him that he could install the inverter now. I also installed some speaker brackets in the lower courtyard.

No comments:

Post a Comment