Friday, May 11, 2007

There was a lot of activity at the job site today. We met with Brad early this morning to mark the spots for the tub spout and valves in the master bathroom.

Mendoza Landscaping was grading the front and back yards and clearing debris.

Alpine Construction removed the old concrete, drilled holes to insert dowels at the joints, and put down a layer of base rock.

Dana finished installing the cabinet doors and drawer fronts in the kitchen.

And Leo drilled the holes for the tub spout.

This evening we found some nice looking mirrors on Costco.com, so we ordered three of them for the master bathroom vanity.

No comments:

Post a Comment